Installation of straight rail:
First, get the track down to size. For example, self-tapping screws are used for the wooden roof, and the track fasteners and tracks are directly fixed to the roof. 400mm--500mm-a fixing piece; if it is a cement shed, first use an impact drill to drill holes, put a wooden wedge, and then use self-tapping screws to directly fix the track fixture and track to the wooden wedge, 400mm-- 500mm for one fixing. Then hang the curtain. If there is a small error, the Korean curtain can adjust the hook, such as the four-claw hook, you must measure the size yourself, and you can use pliers to break the hook if necessary, but this method is not advisable. If a single track is installed, the distance between the track and the window box must be kept at least 2--3 cm, and the distance between the two tracks of the double track must be at least 6 cm.
Installation of bendable rails:
The installation is basically the same as the straight rail, but when encountering special-shaped or arc-shaped, you need to add several more brackets, especially cloth curtains or thick curtains, and the distance between the brackets is between 350 mm or 400 mm. Note that when installing the bendable rail in winter, it must be bent slowly to avoid breaking the straight rail or the bendable rail.
Contact: May liu
Phone: 18320066406
E-mail: may@cnhousehold.cn
Whatsapp:0086-18320066406
Add: Third Floor ,521th Tianyuan Road, Yuangang Street ,Tianhe District ,Guangzhou,Guangdong ,China
We chat